Saltar al contenido →

Pipeline best practices

1.Add Deal Size Value to Each Opp:

(# of opps in funnel) X (value of those opps) = total pipeline value

2. Set Deal Probabilities

(# of opps in funnel) X (value of those opps) X (probability of each opp closing ) = total weighted pipeline value

3. Set Expected Close Dates

Publicado en Sin categoría